GAS FIELD DEVELOPMENT PROJECT HAZOP STUDY FOR PLATFORM气田平台开发项目危险与可操作性研究

967人参与 |分类: 现状评价|时间: 2022年01月10日

1.1       Scope of Work

 

The scope of the HAZOP study was the X 15-1 PRP Platform and X 22-1 CEP Platform process facilities and associated utilities as detailed on the P&IDs, which comprised of:

 

Table 2-1 Basic design drawing index for HAZOP (X 15-1 PRP Platform)

 

P&ID No.

Drawing Title Details

Rev. No

DWG-PRP-PR-1000

 Wellheads.

Rev. B1

DWG-PRP-PR-1005

 Wellheads – flow line details.

Rev. B1

DWG-PRP-PR-1200

 Production header and test header.

Rev. B1

DWG-PRP-PR-1300

 Test Separator.

Rev. B1

DWG-PRP-PR-1500

 PIC valve.

Rev. B1

DWG-PRP-PR-2000

 Condensate coalescer separator.

Rev. B1

DWG-PRP-PR-2005

 Condensate export pumps.

Rev. B1

DWG-PRP-PR-2500

 Production gas cooler.

Rev. B1

DWG-PRP-PR-2505

 Production Separator.

Rev. B1

DWG-PRP-PR-2510

 Inlet gas scrubber and LP gas compressor   (future).

Rev 0

DWG-PRP-PR-2515

 After cooler and discharge gas scrubber   (future).

Rev. 0

......