HAZOP STUDY FOR XGAS STORAGE FACILITY

913人参与 |分类: 现状评价|时间: 2022年01月07日

1.1       Scope of Work

 

The scope of the HAZOP study was XGas Storage Facility Project facilities and associated utilities as detailed on the P&IDs, which comprised of:

 

Table 2-1 Basic design drawing index for HAZOP

 

P&ID No.

图纸名称

Drawing Title DetailsTranslated    from Chinese,

for reference only)

Rev. No

DWG-010012-01

进站分离及烃水露点控制单元工艺原理流程图

PFD. Separation and dew control.

D

DWG-010005-01

注采井工艺原理流程图

PFD. Well station

D

DWG-010008-01

注采井工艺及自控流程图(一)

PID. Well station (1)

D

DWG-010008-02

注采井工艺及自控流程图(二)

PID. Well station (2)

D

DWG-010008-03

注采井工艺及自控流程图(三)

PID. Well station (3)

D

DWG-010008-04

注采井工艺及自控流程图(四)

PID. Well station (4)

D

DWG-010009-01

排液井工艺及自控流程图(一)

PID. Liquid Well System

D

DWG-010019-01

集注站进站分离单元工艺及自控流程图(一)

PID. Gathering Station Separation System(1)

D

DWG-010019-02

集注站进站分离单元工艺及自控流程图(二)

PID.  Gathering Station Separation System(2)

D

DWG-010019-03

集注站进站分离单元工艺及自控流程图(三)

PID. Gathering Station Separation System(3)

D

DWG-010019-04

集注站进站分离单元工艺及自控流程图(四)

PID. Gathering Station Separation System(4)

D

DWG-010020-01

集注站烃水露点控制单元工艺及自控流程(一)

PID. Gathering Station Dew Control System (1)

D

DWG-010020-02

集注站烃水露点控制单元工艺及自控流程(二)

PID. Gathering Station Dew Control System (2)

D

DWG-010020-03

集注站烃水露点控制单元工艺及自控流程(三)

PID.Gathering Station Dew Control System   (3)

D

DWG-010020-04

集注站烃水露点控制单元工艺及自控流程(四)

PID.Gathering Station Dew Control System   (4)

D

DWG-010020-05

集注站烃水露点控制单元工艺及自控流程(五)

PID. Gathering Station Dew Control System (5)

D

DWG-010020-06

集注站烃水露点控制单元工艺及自控流程(六)

PID. Gathering Station Dew Control System (6)

D

DWG-010020-07

集注站烃水露点控制单元工艺及自控流程(七)

PID. Gathering Station Dew Control System (7)

D

DWG-010020-08

集注站烃水露点控制单元工艺及自控流程(八)

PID. Gathering Station Dew Control System (8)

D

DWG-010021-01

集注站乙二醇再生单元工艺及自控流程图

PID. Gathering Station EG Regeneration

D

DWG-010122-01

集注站注气单元工艺及自控流程图(一)

PID. Gathering Station Gas Injection System (1)

D

DWG-010122-02

集注站注气单元工艺及自控流程图(二)

PID. Gathering Station Gas Injection System (2)

D

DWG-010223-01

集注站压缩空气单元工艺及自控流程图(一)

PID. Gathering Station Instrument Air System (1)

D

DWG-010223-02

集注站压缩空气单元工艺及自控流程图(二)

PID. Gathering Station Instrument Air System (2)

D

DWG-010624-01

集注站燃料气单元工艺及自控流程图

PID. Gathering Station Fuel Gas System

D

DWG-010525-01

集注站甲醇注入单元工艺及自控流程图

PID. Gathering Station Methanol Injection System

D

DWG-010426-01

集注站排污单元工艺及自控流程图

PID. Gathering Station Waste Liquid Treatment

D

DWG-010727-01

集注站放空单元工艺及自控流程图

PID. Gathering Station Blowdown System

D

DWG-010732-01

永清分输站工艺及自控流程图

PID. Yongqing Sub-station

D

 

The above-mentioned P&IDs are attached in Appendix II.


大小 : 31 |  下载量 : 1  |  文件类型 : 压缩文件