HAZOP STUDY FOR X LNG RECEIVING TERMINAL PROJECT

996人参与 |分类: 现状评价|时间: 2022年01月07日

1.1       Scope of Work

 

The scope of the HAZOP study was X LNG Receiving Terminal Project facilities and associated utilities as detailed on the P&IDs, which comprised of:

 

Table 2-1 Basic design drawing index for HAZOP

 

P&ID   No.

Drawing   Title Details

Rev.   No

2120-000-PCS-PF-10001

PFD. Process flow diagram Phase I

2A

2120-000-PCS-PF-10002

PFD. Process flow diagram Phase II

2A

2120-010-PCS-PI-10001

PID. LNG unloading arms

2C

2120-010-PCS-PI-10002

PID. NG return arm

2C

2120-020-PCS-PI-10001

PID. LNG storage tank 020.T.01

2C

2120-020-PCS-PI-10011

PID. LP transfer pump 020.P.01 A

2C

2120-030-PCS-PI-10001

PID. BOG compressors suction system &   drain

2C

2120-030-PCS-PI-10002

PID. BOG compressor 030.K.01 A

2C

2120-030-PCS-PI-10011

PID. BOG Recondenser 030.C.01

2C

2120-040-PCS-PI-10001

PID. HP Sendout pump 040.P.01 A

2C

2120-040-PCS-PI-10021

PID. Open rack vaporiser (ORV) 040.E.01 A

2C

2120-040-PCS-PI-10031

PID. Submerged combustion vaporizer

(SCV)040.E.02 A

2C

6175-V-Z-DM-SZC-040051-000-02

PID. Trunkline Metering

2

2120-040-PCS-PI-10052

PID. Gas Makeup for Tanks & vacuum   breaking

2A

2120-050-PCS-PI-10001

PID. Truck loading system

2C

P&ID   No.

Drawing   Title Details

Rev.   No

2120-050-PCS-PI-10002

PID. Truck loading arm (Bay A)

2C

2120-100-PCS-PI-10001

PID. Interconnecting unloading &   storage area

2C

2120-100-PCS-PI-10002

PID. Interconnecting vaporazation &   sendout area

2C

2120-120-PCS-PI-10001

PID. Fuel gas system

2C

2120-130-PCS-PI-10001

PID. Flare system

2C

 

The above-mentioned P&IDs are attached in Appendix II.